Pool Construction Process

Check out this bird’s eye view of one our latest projects.  This video walks you through all the stages of constructing an inground pool, from breaking ground, to framing, and installing the vinyl liner.  This part of the process typically takes 1-2 weeks, as long as mother nature cooperates.  All that’s left is the finishing […]

Why is My Liner Wrinkled?

Occasionally, wrinkles develop in vinyl pool liners.  Here are some of the causes of, and what you can do about it. Pool liner wrinkles caused by chemicals:  If you keep your pool chlorine level consistently high, or your pool pH level consistently low – you could develop puckering in your pool liner. It can be […]

Perfect Pool Water

Crystal clear, sparkling, clear as a bell, blue.  These are all descriptions people have of their pool water when everything is seemingly going well.  But what happens when your water is not one of these describing colors? Sometimes water changes colors; most of the time it is due to a chemical imbalance, lack of circulation, […]

Pool Entry and Seating Options

So you’ve decided to the take the plunge and build a pool! One of the many things to consider when designing your new pool is how you will get in and out of the pool.  Most pools will use a step and ladder combo.  Steps with a handrail in the shallow end make it easy […]